A well on sandy soil can be replaced with a drainage cushion, which looks like a trench with a depth of one meter and a width of 0.3 meters. From above, this system is filled with crushed stone in a layer of 20 cm. The discharge that will be discharged is discharged onto the cushion.
Installation from a pit
Sites that have poorly draining soil will benefit from runoff treatment when installing a system with a receiving system.
Areas with poorly permeable soil will be best treated with runoff when installing a system with a receiver. It is made of a material that does not allow water to pass through and collects all the sewage waste of the house, processes it. After that, the drain is directed through a pipe outside the boundaries of the estate. It is worth noting that when using this sewerage system, it is necessary to provide a device to combat unpleasant odors. To get out of this situation, we have derived the following recommendations from specialized literature and videos:
Installation of a plate under the pipeline;
Maintain a distance of 5 cm from the bottom to the plate;
Attention! It is best to transport the room drain malta mobile database high-strength polyethylene pipes. Such sewerage can also be connected to the bathroom if it is rarely used.
Installation – stages and features
So, do-it-yourself sewerage for a bathhouse is mainly made in the form of a two-chamber septic tank
In this section, based on the studied videos, photos and literature, we have created a step-by-step guide to the implementation of the installation scheme. So, do-it-yourself sewerage for a bathhouse is mainly performed in the form of a two-chamber septic tank, so we will consider the installation of this device.
In order to start construction work, we need to know the concept of such quantities as depth and quantity of materials. If it is not difficult for you to fill with concrete, then you can do without the services of specialists. It is worth noting that the installation of the device as a whole will take 4 days if the work is carried out by four people.
Preparing the excavation pit
The inlet pipe drain must be 12 cm high from the bottom;
-
- Posts: 524
- Joined: Sat Dec 21, 2024 3:29 am