Sequence of installation of the drainage system
Installation of water collection
Install the end bracket 5 taking into account paragraph 2 of the “General Provisions”.
Install the brackets for funnel 11. For the version with a frontal board, funnel 11 is attached without brackets.
Hang the slope of the gutter from the end bracket to the funnel bracket. For the option with a frontal board - from the recess of the end bracket 5 to the lower edge of the funnel cut 11.
Install the gutter connector brackets 7. F
Connector 7 or its bracket are installed taking into bc data indonesia paragraphs 1 and 3 of the “General Provisions”.
The distance between the centers of the funnel 11 and the connector 7 must not exceed 3,080 mm.
Install intermediate brackets 9 taking into account paragraph 3 of the “General Provisions”.
Fasten the funnel 11 and the gutter connector 7 to the fasteners (bracket, connector).
For the version with a frontal board, funnel 11 and connector 7 are attached without brackets.
Cut a gutter of the required length 8 and connect it to funnel 11 and connector 7.
Cut the gutter to the required length 6 and place it on the connector and end bracket.
Repeat the operations for the adjacent side of the roof (bracket 2, gutter 3).
Install the corner piece of gutter 4 into gutters 3 and 6.
Place the funnel plug 12 onto the open end of the funnel 11.
Place gutter cap 1 onto the open end of the gutter.
Insert mesh for funnel 10.
Installation of a spillway
Place the coupling or elbow 13 on the drain hole of the funnel 11 until it stops, depending on the installation location. If necessary, secure the coupling or elbow 13 to the funnel 11 with a self-tapping screw.
Assemble the required configuration of the shaped part of the drain (elbow 13, pipe section 14, elbow 15). When assembling the shaped part of the drain, the following requirements must be met: Fittings 13 and 15 in the shaped part of the drain are connected to each other only through the intermediate section of pipe 14 and, if necessary, are secured to the pipe section with self-tapping screws.
Secure the lower fitting 15 with clamp 16 in the “Fitting” position.
Place pipe 18 all the way onto the lower fitting 15 of the shaped part of the drain.
Place the pipe vertically. Mark the location of the universal clamp in the middle of the pipe 17.
Put pipe 18 on fitting 15. Fix it in clamp 17.
The middle clamp is mounted in the “Pipe” position.
or the option with a fascia board, install the connector itself 7.
-
- Posts: 524
- Joined: Sat Dec 21, 2024 3:29 am