This could be a metal strip that is secured
Posted: Thu Feb 06, 2025 10:07 am
If the roof slope on which the collector battery will be installed is steep, then special boxes are made for the hose spirals - from bars, plywood or metal sheet. For this, you will need bars 40x40 or 40x50 mm, plywood 6 mm thick, or a metal sheet 1.5-2 mm. The blanks of the future module are treated with an antiseptic (wood) or anti-corrosion compounds (metal). Then a box is assembled from them for one or more spirals. By the way, old window frames can be used as the sides of the box, on which the bottom part is simply mounted.
For preliminary treatment of metal and wood, it is necessary to purchase antiseptic, anti-corrosion and primer compounds.
The hoses (pipes) will experience considerable loads from the mass of the coolant, and from temperature and internal pressure changes. Therefore, they will try to disrupt the installation, deform, sag, so it is necessary to provide special fastenings to maintain them in the initially specified position.
Another option is a loose connection with a tight cord or a plastic tie-type clamp with a crosspiece or crossbar. However, this method of fastening is more suitable for a plastic pipe than for a hose, since it can sag on the cord when the rubber expands. If a reinforced rubber hose is selected for the manifold, this method is quite suitable for fixing.
Another fastening option suitable for a plastic pipe or reinforced hose can be nails with wide heads. They can be driven either into the bottom of the box (in this case, it should be at least 10 mm thick) or into a kind of crosspiece made from a bar.
It will also be necessary to prepare connecting kazakhstan mobile database for the hose or pipes. There are quite a few types of such fittings, but you need to choose exactly those that are intended for the material selected for the manufacture of the manifold. In addition to such connectors, threaded fittings will be required to transition from a plastic or rubber pipe to a common metal one. Such a connection will be necessary if the manifold consists of several modules. To know how many connecting elements will be required, you need to draw a schematic diagram of the system being created in advance and calculate their number on it.
To combine all modules into a single battery, two collectors are required - sections of metal pipe. Cold water will flow into the heat exchangers through one of them, fixed at the bottom of the battery, and heated water will be collected in the second one, fixed at the top.
The upper pipe will be connected to the storage tank, i.e. go to the consumer. It should have a diameter of 40 รท 50 mm.
Battery installation
Having prepared everything you need, you can start working.
For preliminary treatment of metal and wood, it is necessary to purchase antiseptic, anti-corrosion and primer compounds.
The hoses (pipes) will experience considerable loads from the mass of the coolant, and from temperature and internal pressure changes. Therefore, they will try to disrupt the installation, deform, sag, so it is necessary to provide special fastenings to maintain them in the initially specified position.
Another option is a loose connection with a tight cord or a plastic tie-type clamp with a crosspiece or crossbar. However, this method of fastening is more suitable for a plastic pipe than for a hose, since it can sag on the cord when the rubber expands. If a reinforced rubber hose is selected for the manifold, this method is quite suitable for fixing.
Another fastening option suitable for a plastic pipe or reinforced hose can be nails with wide heads. They can be driven either into the bottom of the box (in this case, it should be at least 10 mm thick) or into a kind of crosspiece made from a bar.
It will also be necessary to prepare connecting kazakhstan mobile database for the hose or pipes. There are quite a few types of such fittings, but you need to choose exactly those that are intended for the material selected for the manufacture of the manifold. In addition to such connectors, threaded fittings will be required to transition from a plastic or rubber pipe to a common metal one. Such a connection will be necessary if the manifold consists of several modules. To know how many connecting elements will be required, you need to draw a schematic diagram of the system being created in advance and calculate their number on it.
To combine all modules into a single battery, two collectors are required - sections of metal pipe. Cold water will flow into the heat exchangers through one of them, fixed at the bottom of the battery, and heated water will be collected in the second one, fixed at the top.
The upper pipe will be connected to the storage tank, i.e. go to the consumer. It should have a diameter of 40 รท 50 mm.
Battery installation
Having prepared everything you need, you can start working.